American Structurepoint, Inc. - SOQ for Gerrard and Allison Storm Relief Project
Owner
- Town of Speedway, IN
Developed two XPSWMM models for the separation of two combined
sewer areas in the Town of Speedway, IN. Assisted the Town in
locating new flow meters for calibration purposes and conducted
calibration of the XPSWMM models using flow meter and rain gauge
data. Modeled the effects on the combined sewer system using the
IDEM 1-year 1-hour storm and 10-year 1-hour storm and modeled
separation alternatives for the combined areas. Determined the
size of the new storm sewers, underground detention pond, and best
management practice (BMP) measures for storm water quality and
evaluated the flows in the receiving creek. Prepared a report of
the existing system which outlined the proposed separation
alternatives, pipe sizes, detention pond, and BMP’s.
Dates - 12/2008 - 9/2009
Black
&
Veatch Corporation- White River North Water Treatment Plant (WTP) Hydraulics Review
Owner
- Veolia Water Indianapolis, LLC (VWI)
Performed an engineering review of the hydraulic evaluations of the
Whiter River North water treatment plant (WTP) prepared by Black
&
Veatch. Black & Veatch contracted with VWI to provide
preliminary engineering services for the technical upgrades and other
improvements at the WTP to meet water quality goals and regulatory
compliance. Powers Engineering performed the following services:
attended a project initiation meeting with Black & Veatch to
review, discuss, and clarify coordination of work, schedule,
understanding of scope of services and deliverables; performed a review
of the Black & Veatch hydraulic evaluations of the WTP
facilities,
including the basis of design criteria, spreadsheet calculation and
hydraulic profile; prepared a brief technical memorandum (TM) detailing
the findings of the hydraulic evaluations review; reviewed results of
the hydraulics evaluations and TM with Black & Veatch.
Dates - 09/2009 - 11/2009
|