top of page

Evansville West WWTP Expansion

Resident Project Representation

Provided full-time RPR services during the construction to expand the peak wet weather capacity of the existing West Wastewater Treatment Plant (WWTP) from 40 MGD to 45 MGD. The scope also included the construction of a 6.1 MG CSO Equalization Storage Basin upstream of the WWTP. The plant expansion work included: Modifications to the Main Building, Influent Pump Station, and Effluent Pump Station; New Grit Removal & Handling Facilities; Conversion of the Chlorine Contact Tank to an Ultraviolet (UV) Disinfection Facility; New Chemical Phosphorus Removal System; Expansion of the existing Biological Aerated Filtration System; Laboratory modifications; A new High-Pressure Plant Water Pump Station; Addition of a new effluent sewer; and miscellaneous site improvements throughout the entire facility.

Contact

Want to learn more about our services or interested in joining our team? Contact us!

EVANSVILLE OFFICE

915 MAIN STREET, SUITE 306

EVANSVILLE, IN 47708

​​

INDIANAPOLIS OFFICE

101 W OHIO, SUITE 575

INDIANAPOLIS, IN 46204

LOUISVILLE OFFICE

312 S 4TH STREET, SUITE 700

LOUISVILLE, KY 40202

Thanks for submitting!

bottom of page