Managed the design of 900 LF of large diameter sanitary sewer and flow control structures for a sanitary sewer overflow elimination project. Coordinated with three other project team members as well as MSD. The goal of the project was to store and slowly release peak wet weather flows. The largest challenge was providing the needed volume while maintaining minimum slope and cover values.