Trinity Stormwater Park

Combined Sewer Separation

Performed H&H modeling efforts for the stormwater separation project that redirects stormwater from a 50-acre combined sewer basin in downtown Evansville to a 2 MG stormwater detention and infiltration basin. The project also included inventorying roof and building drain connections to the sewer system and the preparation of maintenance of traffic design drawings.